Abstract

The multistage hybrid flow shop (HFS) scheduling problems are considered in this paper. Hybrid flowshop scheduling problems were proved to be NP-hard. A recently developed cuckoo search (CS) metaheuristic algorithm is presented in this paper to minimize the makespan for the HFS scheduling problems. A constructive heuristic called NEH heuristic is incorporated with the initial solutions to obtain the optimal or near optimal solutions rapidly in the improved cuckoo search (ICS) algorithm. The proposed algorithm is validated with the data from a leading furniture manufacturing company. Computational results show that the ICS algorithm outperforms many other metaheuristics.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call