Abstract
Controlling the critical construction steps of the CRD method plays an important role in ensuring construction and ensuring construction safety. When using the CRD method for the construction of the Re Shuitang No. 3 tunnel, through the numerical simulation of the initial support structure and the temporary support structure during the tunnel construction process, it is concluded that the left upper step, the upper right step and the temporary support structure are obviously stressed. Construction steps. According to the analysis results, the surrounding rock of the vault should be strengthened in advance, and the second lining structure should be applied after the surrounding rock is stabilized.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.