Abstract

A construction technique, which required precise design of temporary handling equipment and support structures, is described. The technique involved yard assembly and move-in of the Prestressed Concrete Reactor Vessel bottom head assembly. Design of all move-in and temporary support equipment was in accordance with stringent deflection and final position tolerances. The parallel yard assembly of the bottom head and construction of the PCRV support ring in the building structure resulted in a critical path schedule savings of approximately 7 months. All temporary handling equipment and support structures performed as designed, and all as-built dimensions were within specification tolerances.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.