Abstract
AbstractThe construction of shield tunnel often occurs in composite stratum, so it is of great significance to study the law of surface deformation under the working condition of composite stratum in order to ensure the safety of shield construction. Based on the actual tunnel engineering, the law of ground surface soil deformation caused by shield construction in the composite stratum of upper sand and lower rock is studied by using the method of field measurement. The results show that: The width coefficient of the surface settlement trough basically remains stable with the shield construction, and the stratum loss rate changes exponentially with the shield construction; Affected by the disturbance of the previous shield construction, the surface settlement trough caused by the subsequent shield construction is no longer on the top of the tunnel axis, and will move with the construction process, which is greatly affected by the shield attitude parameters; Taking into account the conditions of the center movement of the settlement trough of the subsequent tunnel, the total surface settlement caused by the successive shield constructions adopts the modified Mark-bolt formula to make the fitting parameters of the settlement trough more suitable for reality.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.