Abstract

In this paper, the dynamic response characteristics of rubber concrete tunnel lining are studied when the cross clearance of intersecting tunnel is 3 m, 6 m, 9 m and 12 m respectively, the results show that the vertical displacement, vertical acceleration and maximum principal stress of the measuring point increase gradually as the train moves closer to the measuring point, and decrease to zero after reaching the final value, moreover, the vertical displacement, vertical acceleration and maximum principal stress of the vaults of the two tunnels are the largest, and with the increase of the cross-section net distance, the vertical displacement, vertical acceleration and maximum principal stress of the monitoring points at the vault of section a decrease gradually. Taking the A-d test points as an example, the vertical displacement of the corresponding test points of the rubber concrete lining decreases by 0.0125 mm, 0.0074 mm, 0.0054 mm, 0.0040 mm respectively compared with that of the normal concrete lining when the cross clear distances are 3m, 6m, 9m and 12m, the vertical acceleration decreases by 0.074 m/s2,0.05 m/s2,0.026 m/s2,0.018 m/s2 , respectively, and the maximum principal stress decreases by 4.3 kPa, 2.4 kPa, 1.2 kPa, 0.4 KPA respectively.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call