Abstract

A study of the underground tunnel planning reliability for megacities is proposed based on the use of foresight and cognitive modeling methodologies. Using the foresight methodology allows, with the help of expert estimation procedures, to identify critical technologies and build alternatives of scenarios with quantitative characteristics. For the justified implementation of a particular scenario, cognitive modeling is used, which allows to build causal relationships based on knowledge and experience, understand and analyze the behavior of a complex system for a strategic perspective with a large number of interconnections and interdependencies. The suggested study allows the reliability planning of underground tunnels on the basis of reasonable scenarios selection and justification of their creation priority.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.