Abstract
As part of the government policy related with the development of road infrastructure, the acceleration of the toll road investment is expected to be able to push the road network performance and the regional economy. One of the plans is the development of Yogyakarta-Solo toll road with the length of segment is ± 40,5 Km. The basic toll rate is set in the beginning during the concession time as one of the parameters of a toll road investment. Based on the design of particular toll road, this research is then done to determine the particular basic toll rate. The methods that may be used as approaching the determination of the particular rate, such as: Saving of Vehicle Operating Cost Method (saving of VOC), Willingness to Pay (WTP), and Ability to Pay (ATP). From the toll rate calculation results based on the saving VOC and ATP/WTP analysis result, with the assumptions for the toll road to begin operating in the year 2018, hence the proposed value of the Yogyakarta-Solo toll rate is Rp. 26.000 (+ Rp. 675/km).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.