Abstract

In order to match the beam exiting the RFQ to the superconducting cavities and to minimize the longitudinal beam extension, three rebunchers will be installed in the Medium Energy Beam Transport (MEBT) of SARAF-LINAC phase II. CEA is in charge of the design and fabrication of the copper-plated stainless steel, 3-gap rebunchers. Beam dynamic simulation leads to the global MEBT design. The rebuncher was successfully conditioned to the RF power of 4.4 kW required for CW operation, with sufficient power margin. A solid state power amplifier of 10 kW developed by SNRC is used during the RF test. The rebuncher shows a good performance in terms of the dissipated power, peak temperatures and vacuum level.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.