Abstract

The need for electricity has increased every year. One of the most popular supply of electrical energy is electrical energy from energy sources flowing and plunging water, called as the Micro Hydro Power Plant (PLTMH). Cisadane River is one of the major rivers with length around 80 kilometers and crosses 44 districts in 5 regencies / cities, including desa Kranggan, South Tangerang. Therefore, community service is carried out in an effort to utilize and optimize the flow of the Cisadane river. The Study of PLTMH design for community service program was conducted. Data of river flow, altitude and location of the river flow will be collected so that it can be calculated and observed for the design of PLTMH that best suits the efficiency of the largest electrical energy, which is obtained using the TurbinPro software program. PLTMH planning chose to use a propeller/kaplan turbine because of its low head which is 4 meters. The power generated is 994 kW at a maximum head with an efficiency of 91.2% and a river flow of 52.26 m3/s and at a minimum head of 601 kW with an efficiency of 82.2% and a discharge of 47.56 m3/s. Keywords: electrical energy, community service program, PLTMH, power generation, Kaplan turbine

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.