Abstract
South Kalimantan is not spared by the flood. One of the rivers that floods are the river Riam Kiwa. The area being flooded each year is the District Astambul. This research will discuss about the capacity of the river Riam Kiwa Astambul Ruas assisted by HEC-RAS software 4.1.0. The method used is a field research conducted along the river Riam Kiwa Astambul segment, so we get the river Riam Kiwa geometry data were reviewed. The data is then combined with hydrological data so it can do the analysis of hydrology and hydraulics. The research results obtained are flood discharge river Riam Kiwa plans vary for different periods of time. Flood discharge plan increased from 2 years return period flood discharge plan to return period of 100 years. River Riam Kiwa Astambul Ruas could not accommodate due to the capacity of the river is not comparable with the incoming flood discharge. One of the flood control efforts on the river Riam Kiwa Segment Astambul is to build dikes. Embankment required varies for each variation of the flood discharge with return period with a maximum height of 11.0 m embankment. High embankment increases with increasing flood discharge plan.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.