Abstract

This research is a follow-up to the findings of the inspection and grounding testing in PKM 2018 activities. The value obtained exceeds 5 ohms. This is not according to the standards based on the General Requirements for Electrical Installation (PUIL) 2011. In the 2019 PKM program activities, evaluation and renovation studies of the installed earthing system which includes: surveying the location to be grounded, drilling for the position of the electrodes to be installed, installation of electrodes equipped with Bentonic material which functions as a binder so that the electrodes with the ground become one and strong, measurement of the earthing value, perform grounding installation, re-measurement of earthing. The earthing value obtained is much smaller than the previous measurement results of 2.83 ohms in the Electronics Laboratory and 2.72 Ohms at the Automation Laboratory of SMKN 1 Cimahi. It is according to the recommended standard PUIL 2011. The PKM team proposes the management of SMKN 1 Cimahi to carry out a routine maintenance and measurement process twice a year on the newly installed earthing system so that the earthing value remains according to the standard.

Highlights

  • Permasalahan yang dihadapi mitra diketahui pada pahun 2018 yang lalu dimana pada waktu itu tim dari Program Studi Teknik Listrik Jurusan Teknik Elektro Politeknik Negeri Bandung melaksanakan kegiatan Pengabdian kepada Masyarakat di SMK Negeri 1 Cimahi dengan mengadakan pelatihan dasar K3 Listrik

  • This research is a follow-up to the findings of the inspection and grounding testing

  • This is not according to the standards based on the

Read more

Summary

Pendahuluan

Permasalahan yang dihadapi mitra diketahui pada pahun 2018 yang lalu dimana pada waktu itu tim dari Program Studi Teknik Listrik Jurusan Teknik Elektro Politeknik Negeri Bandung melaksanakan kegiatan Pengabdian kepada Masyarakat di SMK Negeri 1 Cimahi dengan mengadakan pelatihan dasar K3 Listrik. Ketika praktek pengukuran resistans pentanahan instalasi listrik di laboratorium Program Studi Teknik Listrik Otomasi SMK Negeri 1 Cimahi, nilai resistan pentanahan hasil pengukuran tidak sesuai stadar PUIL 2011 yaitu maksimum 5 Ohm. Dari hasil penemuan tersebut maka pihak mitra meminta agar kegiatan pengabdian kepada masyarakat bisa dilanjutkan tahun berikutnya dengan topik perbaikan pentanahan instalasi listrik sekaligus memberikan pengetahuan tentang pemasangan pentanahan instalasi listrik kepada guru, teknisi, dan siswa di SMK Negeri 1 Cimahi. Tujuan dari program ini adalah untuk meningkatkan pengetahuan dan keterampilan guru, teknisi, dan siswa dalam hal evaluasi dan pemasangan instalasi pentanahan untuk instalasi listrik dengan target khusu untuk memperbaiki nilai reistans pentanahan yang tidak sesuai standar PUIL 2011 dan hasil kegiatan tersebut bisa dijadikan artikel ilmiah. Diharapkan dengan mengevaluasi dan menghitung diperoleh nilai sesuai dengan standar PUIL 2011, yaitu maksimum 5 Ohm (SNI 0225. 2011)

Metode
Kesimpulan
Daftar Pustaka
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call