Abstract

The project case of Qiwu Bridge using link slab action between simply supported composite spans is introduced. The 60 m-span girder of Qiwu Bridge is the longest and heaviest among the composite girders erected by bridge-erecting machine in China. Qiwu Bridge consists of a series of 3 simply supported spans built with composite girders and connected at the pier supports by a link slab. This solution has both advantages of (1) smooth driving condition and enhancement of durability by removing expansion joints and (2) clear structural behavior as simply supported spans. A finite element model was established to simulate and predict the mechanical response of this semi-continuous solution. Numerical results showed that the removal of the shear connection around the link slab decreased the stress level but also caused a stress mutation. Qiwu Bridge was also monitored by vibrating wire strain gages to follow its actual structural response. From preliminary monitoring data and numerical results, it can be concluded that the proposed construction method and the static scheme is safe for the 60-span composite girder with a large safety margin. Further experimental results will be obtained during the service stage of the bridge to validate the in-service performance of the proposed steel-concrete composite bridge with link slab.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.