Abstract
The purpose of this paper is to raise construction industry awareness regarding structural grouting of precast concrete projects in the United States. Incidents related to structural grouting have occurred with both precast concrete systems and other building systems. Designers, architects, owners, insurance carriers, and the construction industry in general are becoming increasingly aware of deficient grouting installation methods and verification procedures. Concerns include the timeliness of grout installation during the erection process, the lack of grout on some components of finished projects, and the poor quality of installed grout. These concerns pertain to horizontal connection joints of critical load-bearing elements between foundations and precast concrete columns and walls, stacked precast concrete columns, and stacked precast concrete walls. Current building codes and standards provide no requirements and limited guidance for the installation or special inspection of these critical horizontal joints. In an effort to address this gap in building codes and standards, as it specifically relates to precast concrete structural products, some precast concrete producers and erectors are implementing several strategies and new procedures, as noted and further developed in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.