Abstract

AbstractThe excavation of a large-sized foundation pit for one skyscraper in Shanghai required installation of a 100-m diameter unpropped circular diaphragm wall at the pit center first, followed by installation of a multipropped rectangular diaphragm wall at the periphery. Due to the limited paper length, this study just focuses on the structural behaviors of the inner circular wall and those of the outer rectangular wall will be presented in a companion paper. The circular diaphragm wall exhibited apparent spatial arching effects during excavation and only slight differences were observed in its maximum lateral movements along the circumference. Like braced struts, waler beams mainly carried the load due to soil removal in the proximity. In contrast, the circular diaphragm wall carried the hoop stresses due to soil removal throughout the excavation. The vertical bending stresses in diaphragm wall panels were symmetric about their neutral axes. Although the adopted remedial measure effectively mitigated ...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.