Abstract

An operability certificate is required before using a building. The building operability certificate concerns occupants' safety before the building is used and is directed by Law Government Regulation 16 of 2021 for building security. This article discusses implementing a building operability certificate underperforming and the strategy for implementing the building operability certificate (SLF) policy. This research uses a descriptive qualitative method. First, qualitative data analysis utilizing SWOT determined the building operability certificate implementation strategy. Second, ranking strategies are analyzed to identify (QSPM's) priorities. According to the regulation that every building must have SLF, the building operability certificate was not appropriately implemented. With the current building information system legislation, each region can issue Building Approval (PBG) and building operability certificate (SLF). Research findings based on SWOT and QSPM are used to generate seven strategies: Regional Apparatus Work Units (SKPD) commitment, increased socialization, regulation implementation, capacity building, optimal communication, SIMBG implementation, and increasing resources.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.