Abstract

This paper aims to determine a flexible and extensible model (strategic framework) in classifying the needs of materials/services as a procurement guideline for the company’s operating and maintenance service providers (O&M) power plants. PT PJB Services is a service provider of O&M which leads the market by managing power plants scattered across various islands facing problems related to the delay supply of spare parts. One of the efforts that can be done is to increase the efficiency of the procurement process by determining the model to identify important supply chains. This Model was obtained by the analysis of purchase portfolio using the Kraljics matrix. The design is based on a spare part position in the Kraljic portfolio Matrix consisting of a dimension of risk procurement and impact profit. The application of this model enables the determination of the critical company in the high lead time problem and the provider of materials/services involved. Analysis of critical needs position (including the suppliers involved) in the Kraljic matrix allows can be defined some strategies that may be applied to the lead time reduction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.