Abstract

Performance Based Logistics (PBL) concept has an aim to improve the system availability and it has been extensively researched in the recent years. These researches showed that inventory level does not impact system availability as much as component reliability and repair time in repairable system operating under PBL contract. Based on that, in this paper, we propose a new stochastic model for determination of annual repair rate for critical aircraft components in such system in order to achieve desired availability. The result obtained could be used for planning of base stock level and capacity of repair facilities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.