Abstract
Economic dispatch problem (EDP) is an elementary optimization problem of power systems whose purpose is to minimize the total generation cost while meeting total demands and complying with individual generator output constraints. This paper proposes a distributed optimization algorithm with noisy gradient based on stochastic gradient-push approach to solve the EDP on time-varying directed communication networks potentially with time delays. It shows that the proposed algorithm can be ensured to solve the EDP when the time-varying directed communication networks are uniformly jointly strongly connected. The algorithm with asynchronous step-sizes can deal with the finite time-varying delays on communication links as well. The generation cost functions are considered as strictly convex and strongly convex functions respectively with convergence rate of Olnk/k and Olnk/k. Simulation results are provided to validate the availability of the algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power & Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.