Abstract

The communication delay of train control services has a great impact on the track utilization and speed profile of high-speed trains. This paper undertakes stochastic delay analysis of train control services over a high-speed railway fading channel using stochastic network calculus. The mobility model of high-speed railway communications system is formulated as a semi-Markov process. Accordingly, the instantaneous data rate of the wireless channel is characterized by a semi-Markov modulated process, which takes into account the channel variations due to both large- and small-scale fading effects. The stochastic service curve of high-speed railway communications system is derived based on the semi-Markov modulated process. Based on the analytical approach of stochastic network calculus, the stochastic upper delay bounds of train control services are derived with both the moment generating function method and the complementary cumulative distribution function method. The analytical results of the two methods are compared and validated by simulation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.