Abstract
After deregulation of the Power sector, uncertainty has increased considerably. Vertically integrated utilities were unbundled into independent generation, transmission and distribution companies. Transmission network expansion planning (TNEP) is now performed independent from generation planning. In this environment TNEP must include uncertainties of the generation sector as well as its own. Uncertainty in generation costs affecting optimal dispatch and uncertainty in demand loads are captured through composite scenarios. Probabilities are assigned to different scenarios. The effects of these uncertainties are transferred to the objective function in terms of total costs, which include: generation (dispatch), transmission expansion and load curtailment costs. Two formulations are presented: stochastic and minimum regret. The stochastic formulation seeks a design with minimum expected cost. The minimum regret formulation seeks a design with robust performance in terms of variance of the operational costs. Results for a test problem and a potential application to a real system are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.