Abstract

This study presents a mixed-integer linear programming (MILP) model to solve the simultaneous transmission network expansion planning (TNEP) and reactive power planning (RPP) problem. The proposed model considers reactive power, off-nominal bus voltage magnitudes, power losses, multistage expansion, and security constraints. The use of an MILP model guarantees convergence to optimality by using existing classical optimisation methods. In order to validate the approximation performed, the steady-state operation points were compared with those obtained using an AC load flow method. Garver's 6-bus system and a modified IEEE 118-bus system were used to show the precision and efficiency of the methodology. The results indicate that better expansion and generation plans are found by considering RPP simultaneously with the AC TNEP, when the solutions were compared with the plans of the TNEP using the AC model without RPP and the TNEP considering the DC model, with RPP conducted at a subsequent stage.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.