Abstract
The most commonly used designs for securing vertical walls of trenches and excavations in the actual conditions of work in them do not allow for strict compliance with regulatory safety requirements. To prevent ground failure in trenches and excavations, you can develop ground with a slope angle smaller than the natural slope angle. Development of excavations with vertical walls without securing them is limited to their depth depending on the strength properties of the ground. When excavating to a depth of up to 2-3 m the vertical walls of trenches and excavations must be secured. In this case, the development and backfilling of such excavations should be carried out using constructive solutions (e.g. anchoring), which in original combinations with modern construction materials and technologies allow various construction works to be safely performed in them.
Highlights
Any type of construction and installation work on new construction sites, as well as the overhaul of existing properties has a rather high level of danger and injury [1,2,3,4,5], which can be both potential probabilistic and real [6,7,8,9,10]
To prevent ground failures in excavations and trenches, excavation with slopes or installation of vertical excavation wall supports must be performed in accordance with applicable safety standards
The purpose of this study is to develop new structural solutions to strengthen the walls of trenches and excavations to ensure compliance with safety standards when carrying out construction and installation work in these excavations
Summary
Any type of construction and installation work on new construction sites, as well as the overhaul of existing properties has a rather high level of danger and injury [1,2,3,4,5], which can be both potential probabilistic and real [6,7,8,9,10]. The achievement of these goals is facilitated by the performance of a comprehensive qualitative examination of the building structures, monitoring of their technical condition, the construction equipment selected for use [15,16,17,18], and the preparation of all required project documentation [19, 20]