Abstract

At CERN a 5 cell 500 MHz superconducting accelerating cavity has been constructed. At present the cavity is installed in the PETRA storage ring at DESY for a test run which will start middle of March. The cavity is equipped with a high power coupler and with 5 higher order mode couplers, two of the loop type and three of the antenna type. Frequency tuning and regulation are achieved by varying the length of the two end-cells. In a test of the complete cavity-cryostat system at CERN, acceleration fields of 2.8 MV/m and Q0-values above 109 have been reached. The cryostat losses remained below 10 W.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.