Abstract

Abstract The present status of the main components of the TJ-II Electron Bernstein Waves (EBW) heating system are presented. The O-X-B scenario has been chosen for first harmonic (28 GHz) heating. One 300 kW, 100 ms gyrotron has been checked and is ready for installation. The design of a new high voltage power supply unit is finished. The microwave power will be transmitted by an oversized corrugated waveguide. Two ellipsoidal mirrors optimise the gaussian beam parameters at the input of the waveguide and two corrugated ones get the required polarization. A movable internal mirror is needed to accomplish the restrictive launching conditions. The present cooling system of the ECRH system is being upgraded to cool the 28 GHz-complex. The start of the experiments is scheduled for the end of 2005.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.