Abstract

A 200 kW, 28 GHz system for electron cyclotron heating (ECH) and electron Bernstein wave heating (EBWH) is being installed on NSTX to assist solenoid‐free startup, high harmonic fast wave heated current ramp up, and to support initial EBW coupling and heating studies. This system will provide on‐axis second harmonic ECH/EBWH in NSTX. Fundamental on‐axis heating may also be possible at 15.3 GHz by operating the gyrotron in a lower order TE01 cavity mode. Sufficient power supply capability will be provided to provide up to 1 MW of gyrotron power for future proof‐of‐principle EBWH experiments on NSTX. Initial modeling of an NSTX startup discharge with 28 GHz ECH is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.