Abstract
Our work reports the results of a study investigating the durability hoist wireline and the determination of its optimum stock. Based on theoretical and experimental studies, is a regular 10...18 % decrease in the wirelines’ durability is reported at hoist operation in autumn-winter period in comparison to operation in spring-summer period. This should be considered when forming the optimum number of hoist wireline stocks to ensure effective operation throughout the year. The methodology developed by the authors for optimizing the stock of hoist wireline can lead to an increased economic efficiency due to reduced operating costs and increased efficiency of hoist operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.