Abstract

This study presents the results of a treatability study for dredged material (DM) stabilization using 20 combinations of pozzolanic agents (lime, cement kiln dust, high alkali and slag cements, and fly ash). The DM consisted of CH/OH soil excavated from the U.S. Army Corps of Engineers Craney Island confined disposal facility in Hampton Roads, Virginia, having an in situ moisture content of approximately 130% and void ratio of 3.35. Mix designs were prepared for each stabilized DM (SDM) blend using a 3-day mellowing period for the SDM blends to become compactable. Typical maximum dry unit weights were on the order of 11.9–12.9 kN/ m3 (76–82 lb/ ft3 ) , for total dry pozzolan doses to wet DM between 5 and 95%, the upper dosing limit being unconstrained for potential use of the SDM blends as fill. Unconfined compression strength (UCS) testing of the SDM blends using DM with an initial MC of 132.5% was completed in accordance with ASTM D1632 and ASTM D1633 for curing times of 7, 28, and 180 days. The 28-day ...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call