Abstract
The graphite mine tailings impoundment was detailed investigated, and the structural features of fill dam in the graphite mine tailings impoundment was analyzed. Then the author created the stability calculating model of this fill dam, calculated its stability coefficient, and evaluated its stability. It can be concluded that: the fill dam was stable under the condition of normal operation, and it was unstable under the condition of flood operation and special operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have