Abstract
Software engineering includes an important 4Ps concept regarding the productivity, processes, people, and project. Efficiently managing skilled people in Software Project Scheduling (SPS), considering various tasks and software project cost is an upheld task. Scheduling and then making Software cost estimation is composite work for project manager (PM) which consists of many cost drivers and their principles related to 4Ps. In this paper, we considered skilled employees as one of the important 4Ps and an important resource to schedule the cost and calculate the cost of the project along with some constraints of tasks. The paper gives a near-optimal estimated cost of project by using different combination of crossover types and dynamic mutation rated Simple Genetic Algorithm (SGA). The paper also considers the aspects of head count, effort and duration calculated by COCOMO-II. These parameters are used to verify the fitness of each chromosome to get estimated cost by SGA closer to the cost estimated by COCOMOII. The concept of concurrency utilization is included in this paper which satisfies the ultimate aim of project manager or company to get the quality project within minimum time and cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.