Abstract
Earned value method is an important tool to evaluate and control the schedule and cost of the project. It is widely used in engineering construction projects, but rarely used in software projects. Due to the characteristics of the software project, the accuracy of the calculation of the basic parameters of the earned value analysis is low, which leads to the fact that the credibility of the result of the earned value analysis becomes very low or even meaningless. In order to make Earned value method applied to software projects better , IFPUG function points method is used to measure the actual completion of software projects, then used earned value method on the basis of IFPUG function point method. This can improved the accuracy of earned value analysis better. In order to analyze the cost and schedule of software projects better, the quality factors of software are also taken into account in the analysis of earned value, this can monitor the cost and schedule of software projects accurately.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.