Abstract
In the article, strengthening of precast reinforced concrete girders with span of 15 m by using prestressed CFRP stripes is described. These girders (together with columns) represent the main structural elements of the canopy by the industrial hall. The necessity to perform the strengthening was caused by excessive deflections of these elements, being a result of rheological processes in the concrete – shrinkage and creep. Possible ways of executing the strengthening by using CFRP strips were analyzed and compared, results of calculations of deflections of the girders before and after their external prestressing were described and the technology of the chosen prestressing system was presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.