Abstract
This article initiates a theoretical investigation into online scheduling problems with speed scaling where the allowable speeds may be discrete, and the power function may be arbitrary, and develops algorithmic analysis techniques for this setting. We show that a natural algorithm, which uses Shortest Remaining Processing Time for scheduling and sets the power to be one more than the number of unfinished jobs, is 3-competitive for the objective of total flow time plus energy. We also show that another natural algorithm, which uses Highest Density First for scheduling and sets the power to be the fractional weight of the unfinished jobs, is a 2-competitive algorithm for the objective of fractional weighted flow time plus energy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.