Abstract

To reduce variation in manufacturing processes, traditional statistical process control (SPC) techniques can be applied to monitor automatic process control (APC) controlled processes for detecting assignable cause process variation. In this paper we compare the monitoring of process output and the monitoring of the control action of Minimum-Mean-Squared-Error- and Proportional-Integral-Controlled processes. We show that the robustness property of the PI controller makes it difficult to detect unanticipated mean shifts when the process output is being monitored. We illustrate how the signal-to-noise ratios developed in Jiang, Tsui, and Woodall (2000) can be used to predict the SPC chart performance and help select the appropriate chart for monitoring.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.