Abstract
The main criterion is the requirement for operation of subsea gas pipelines in developing main technical solutions for the preparation and transportation of gas from offshore fields. In the article were shown the results of analyzes of the treatment units and gas transportation systems in offshore conditions, and the causes of technological complications that have arisen in these processes as well as ways to eliminate such complications.In addition, the operating mode of existing separators for primary gas treatment has been studied and their low efficiency in gas was noted.Taking into account specific features of offshore conditions, the multifunctional device for complex gas preparation was developed and tested. Positive test results are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.