Abstract

The article discusses issues related to solving the problem of switching from one gauge to another. A progressive solution to the problem of different track gauges is the use of a combined gauge design. The combined track solves the problems of overloading, downtime, and wheel set problems. The design of the combined gauge has set new challenges for track infrastructure workers and scientists. The first task is the strength of the combined track structure. The second task is the stability of the combined track plates. The third task is to lay switches in the combined track and determine the permissible train speeds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.