Abstract

This paper deals with large-scale crew scheduling problems arising at the main Dutch railway operator, Netherlands Railways (NS). NS operates about 30000 trains a week. All these trains need a driver and a certain number of guards. Some labor rules restrict the duties of a certain crew base over the complete week. Therefore, splitting the problem in several subproblems per day leads to suboptimal solutions.In this paper, we present an algorithm, called LUCIA, which can solve such huge instances without splitting. This algorithm combines Lagrangian heuristics, column generation and fixing techniques. We compare the results with existing practice. The results show that the new method significantly improves the solution.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.