Abstract
In this paper, aiming at the new characteristics of flexible job shop scheduling in cloud manufacturing environment, this paper studies the residual capacity utilization of cloud manufacturing enterprises, considers the idle time of equipment, studies the workshop scheduling method with idle time, and constructs the scheduling framework of cloud manufacturing operation workshop. The production tasks accepted on the platform are carried out together with the tasks assigned by the workshop itself, with the goal of minimum penalty total cost, and the improved genetic algorithm is used to solve the optimal scheduling sequence of the workpiece. The validity of the proposed method is verified by using the benchmark example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.