Abstract

Two-stage hybrid flowshop scheduling in a single factory has been considered fully; however, the distributed two-stage hybrid flowshop scheduling problem (DTHFSP) is seldom studied in a multi-factory environment. In this study, a DTHFSP with sequence-dependent setup times is investigated and a shuffled frog-leaping algorithm with memeplex grouping (MGSFLA) is proposed to minimize makespan and the number of tardy jobs. After an initial population is generated by an heuristic, two phases are executed sequentially with a new population division. In the second phase, all memeplexes are categorized into three groups, the different search processes are implemented in the different groups and the best memeplex is excluded from population division. A number of experiments are conducted on many instances and computational results validate the effectiveness of the main strategies and the promising advantages of an MGSFLA.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.