Abstract

Distributed scheduling is seldom investigated in hybrid flow shops. In this study, distributed two-stage hybrid flow shop scheduling problem (DTHFSP) with sequence-dependent setup times is considered. A collaborative variable neighborhood search (CVNS) is proposed to simultaneously minimize total tardiness and makespan. DTHFSP is simplified by incorporating factory assignment into machine assignment of a prefixed stage, and its solution is newly represented with a machine assignment string and a scheduling string. CVNS consists of two cooperated variable neighborhood search (VNS) algorithms, and neighborhood structures and global search have collaborated in each VNS. Eight neighborhood structures and two global search operators are defined to produce new solutions. The current solution is periodically replaced with a member of the archive farthest from it. Experiments are conducted , and the computational results validate that CVNS has good advantages over the considered DTHFSP.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.