Abstract

AbstractThe importance of time-cost-quality trade-off in construction projects has been widely recognized by the construction industry. In this paper, we develop an integrated optimization model on the basis of improved time-cost and quality-time models. We improve the traditional cost-time model by taking reward and punishment into consideration. Further, we build a new quality model, called quality performance index (QPI), to describe system reliability. The avoidance of assigning the node weights and referring to expert experience adds to the practicality of the quality calculation. In the process of decision-making, we use contractual time, cost, and quality as benchmarks for evaluation of feasible solutions. Then, we combine an immune genetic algorithm with a constriction factor particle swarm optimization to get a new algorithm, called immune genetic particle swarm optimization (IGPSO). We test the effectiveness of IGPSO using two typical test functions and solve a practical example. Optimization re...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.