Abstract

A 170 GHz, 2 MW, steady-state gyrotron is being developed in collaboration between European research associations and industries to be used for the electron cyclotron resonance heating (ECRH) system of ITER, the gyrotron is presently in the prototype state. EFDA entrusted ENEA with the design of a new power supply for the gyrotron's body; in which, the traditional power vacuum tubes are replaced with solid-state components (IGBT); furthermore ENEA had the task of developing the new body power supply (BPS), following the initial conceptual design. The BPS is formed by 50 identical bidirectional (in current) modules, connected in series; the BPS's control system regulates the output voltage by changing the modulation index. OCEM Spa, under ENEA's supervision, has manufactured the BPS. Tests, done at the start of this year, showed the substantial agreement between the initial technical specifications and the values achieved. Particularly the ramp-up/down-emergency time (50–10 μs), the accuracy (±0.5%), the sine wave modulation (45–20 kV at 5 kHz) and the maximum phase shift (<10°) have been tested. In the article, the new stair-way modulation (SWM) scheme will be sketched and the test results will be described in detail.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.