Abstract

The operation of solar photovoltaic installations for many years may lead to problems such as reduced energy efficiency and aging of components. Under this framework, replacing certain components in the facility to extend the service life of the power plant is viewed, in some cases, as a feasible strategy. However, despite its enormous strategic interest for the solar PV industry, we find that revamping PV installations has been the focus of very few scientific publications, and even less so when it comes to analyzing real facilities. Thus, this paper performs a techno-economic analysis of three revamping strategies at a real PV power plant located in the south-east of Spain. The strategies consist of substituting, in each case, the PV modules, the inverter, and both components. The simulated results show that the highest production value by installed power is obtained when both the modules and the inverter are replaced. In the same vein, the economic analysis reveals this scenario as the most favorable in terms of profitability. Based on the results obtained, an interesting future line of research would be focused on the extension of the analysis at country level to study the joint impact of numerous revamping actions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.