Abstract

Cost, time and quality projection are the crucial aspects in software development process. Incorrect estimations can cause losses which in turn may lead to irreversible damage. It is generally perceived that a imperfectly estimated project always results in a substandard quality due to the efforts being wrongly directed. Firstly Effort Estimation is calculated by actual effort and proposed Effort. That Effort evaluation of 500 NASA projects, after that evaluation is done by four parameters Standard Error, Standard Deviation, Mean Absolute Error, Root Mean Square Error. The author amalgamated the robustness of COCOMO-II with that of Neural Network NN and Support Vector Machine SVM .Quality Which we evaluate that is quality Evaluation of Semantic Web Application. In the last checks the majority of all four parameters for software quality assessment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.