Abstract
The paper examines a complex methodology for calculating the slope stability of a tailing storage facility based on comparing the results obtained through deterministic and probabilistic approaches. The analysis is performed in GeoStudio software, based on the limit equilibrium method, and with a probabilistic approach that uses a Monte Carlo simulation to compute a probability distribution of the resulting factor of safety. A slope stability assessment of tailing dam was conducted on the example of Ferrexpo Poltava Mining, and a conclusion was reached about their reliability and safety. The results of the deterministic analysis showed that the calculated factor of safety is by those established in Ukrainian regulatory standards. It has been recognized that the factor of safety is not a consistent measure of risk for tailings dam. Considering the variability inherent in the soil materials of tailings dam is a way to achieve more accurate results. The importance of obtaining a failure probability and a reliability index due to tailing dam stability was highlighted by comparing deterministic and probabilistic approaches.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have