Abstract

We consider a single-machine scheduling problem in which due dates are linear functions of the job waiting-times and the objective is to minimize the maximum lateness. An optimal sequence is constructed by implementing an index-based priority rule for a fixed value of the due date normalizing constant k. We determine in polynomial time all the k value ranges so that the optimal sequence remains the same within each range. The optimal due dates are computed as linear functions of the global optimal value of k. The overall procedure is illustrated in a numerical example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.