Abstract
We consider a single-machine scheduling problem in which job processing times are controllable through the allocation of a limited resource. The amount of resource consumption of a job is assumed to be linearly related to the job processing time. The performance criteria are the total resource consumption and the number of tardy jobs. Our objective is to construct the trade-off curve between the total amount of resource consumed and the number of tardy jobs. An NP-hardness proof is presented for the problem of minimizing the total amount of allocated resource subject to a limited number of tardy jobs. A pseudo-polynomial-time dynamic programming algorithm is proposed for constructing the trade-off curve. This dynamic program can be generalized to the case where the job processing time is a decreasing function of the amount of allocated resource.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.