Abstract

We consider a single-machine scheduling problem, in which the job processing times are controllable or compressible. The performance criteria are the compression cost and the number of tardy jobs. For the problem, where no tardy jobs are allowed and the objective is to minimize the total compression cost, we present a strongly polynomial time algorithm. For the problem to construct the trade-off curve between the number of tardy jobs and the maximum compression cost, we present a polynomial time algorithm. Furthermore, we extend the problem to the case of discrete controllable processing times, where the processing time of a job can only take one of several given discrete values. We show that even some special cases of the discrete controllable version with the objective of minimizing the total compression cost are NP-hard, but the general case is solvable in pseudo-polynomial time. Moreover, we present a strongly polynomial time algorithm to construct the trade-off curve between the number of tardy jobs and the maximum compression cost for the discrete controllable version.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.