Abstract
This work presents a model of single–machine scheduling problem. The machine is failure–prone and subject to random breakdowns. The processing time is a deterministic sequence that is randomly compressible, which may be from the introduction of new technology or addition of new equipment. Taking into account the cost for the random breakdowns and the random compressible processing time, our objective is to find the optimal scheduling policy to minimize an objective function. Under simple conditions, it is shown that the optimal sequence possesses a V-shape property
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.