Abstract
In real world production systems, uncertain events such as random machine breakdown and processing time can occur anytime. These events lead to disruption of normal activities and consequently invalidate the initial schedule. Considering uncertainty in the scheduling process enables organisations to resume their activities effectively after uncertain events occur. The focus of this paper is proactive scheduling approach with an objective of minimising the total cost (lateness/earliness penalty and tooling cost). Robust optimisation is used to solve the scheduling problem considering processing time, setup times and tooling cost as uncertain parameters. Numerous scenarios are solved using data from local job shop. Multiple performance measurement criteria are evaluated to assess the significance of results obtained using robust and deterministic models. Design of experiment (DOE) has been implemented to evaluate the effects of different factors on the total cost and computational times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.