Abstract

ABSTRACTThis article considers scheduling problems with resource allocation, deterioration effect and position-dependent weights on a single machine. For two different due-date assignment methods—i.e. common (CON) due-date assignment and slack (SLK) due-date assignment—a bi-criteria analysis is provided wherein the first objective is to minimize the weighted sum of the absolute value in lateness with a common due date (a common flow-allowance), and the second objective is to minimize the weighted sum of resource consumption. Optimality properties and algorithms are proposed to solve three different versions of considering these two criteria.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.